https://safetycentral.wpenginepowered.com/wp-content/uploads/2017/06/Stop-NT3-Final-Cut-High-Res-1280.mp4 IP Southern Mick Child and team’s latest “Stop Now Think” film. On subject of sustainability, and they are happy to share with you.
Media / document (mp4)
View mp4 →
Preventing Points Run Through Letter 14.March.17. Network Rail has taken the decision to mandate the implementation of additional controls for the movement of OTMs and OTPs within worksites. The additional control shall include the deployment of Til’ Dawn Lamps (TDL) where there are movements planned over switches and crossings (S&C). The process is mandated for […]
Media / document (pdf)
View pdf →
270217 letter re eye protection and hand protection… From 1st April 2017 Principal Contractors working at a Network Rail Infrastructure Projects worksite will have in place suitable systems to control the risk of eye and hand injuries. The basic principle will be that all staff working on site will as a minimum wear appropriate eye […]
Media / document (pdf)
View pdf →
Minimising Red Zone Working IP Jan 2017 This procedure applies to all work planned and delivered in Infrastructure Projects (IP). It introduces and defines a procedure for contractors, employees and their delegated representatives to follow in order to comply with the specific requirements of IP in implementing Network Rail Standard NR/L2/OHS/019 and RSSB Railway Group […]
Media / document (pdf)
View pdf →
Contractor Engineering Manager approving WPPs. 23.Jan.17
Media / document (pdf)
View pdf →
Construction Phase Plan Checklist
Media / document (xls)
View xls →
Work Package Plan checklist
Media / document (xls)
View xls →