Skip to main content
Safety Central logo
Network Rail logo
  • Safety
    • Safety Communities
      • Ballast Dust Working Group
      • Industry Groups
      • Infrastructure Safety Leadership Group (ISLG)
      • Level Crossings
      • Network Rail Telecom
      • Prevention through Engineering and Design
      • School programmes
      • Sentinel
    • Safety Programmes
      • Home Safe Plan
      • Planning4Delivery
      • Fatigue Reduction
      • Electrical Safety
      • Drive Safe
      • Manual Handling
      • Safety Hour
      • The Emergency Services Guidance and Rail SAFE
    • Commitments, Rules and Policies
      • Close Call
      • Worksafe
      • Our Health and Safety Vision
      • Data Protection and GDPR
      • Code of Business Ethics
      • Driving Safety
      • Construction, Design and Management (CDM)
      • Principal Contractor Licensing (PCL)
    • On Site Solutions
      • Frontline Safety Critical Communications
      • Any Line Open
      • Asbestos Awareness
      • Delivery Point Management
      • Managing the Risk of Runaways
      • On Track Plant Safety
      • Route Services Supply Chain Operations
      • Site Lighting
      • Working at Height
    • Safety Campaigns
      • Public and passenger safety campaigns
      • Safety Outreach Toolkits
      • Risk Management
      • Railway Security
      • Take 5
      • Winter Safety Campaign
  • Health and Wellbeing
    • Occupational Health
      • Occupational Health and Wellbeing Strategy
      • OH Employee information
      • OH Manager support
      • Drugs and Alcohol Standard (Network Rail colleagues only)
    • Mental Wellbeing
      • Coping with Trauma
      • Feeling Positive
      • Handling Pressure
      • Living with Mental Health
      • Million Hour Challenge
    • Physical Wellbeing
      • Healthy Lifestyle
      • Managing Your Health
      • Training for Performance
    • Supporting wellbeing at work
      • First Aid
      • Defibrillators – Manager Support
      • Domestic Violence
      • Health Management Action Plan (HMAP)
      • Leading sensitive conversations
      • Supporting employee wellbeing at work
      • Menopause
    • Network Rail Employee Area
      • Employee Area Login
  • Environment and Sustainable Development
  • Tools & Resources
    • Tools
      • Behavioural Safety
      • Fair Culture Investigations
      • Infrastructure Loading Patterns
      • CIRAS
      • Jargon Buster
      • Opsweb
    • Resources
      • Resource library
      • Safety Bulletins
      • Safety Hour discussion packs
      • Safety Stand Down Materials
      • Improving Railway System Safety
      • Safety Outreach Toolkits
      • Our Health and Safety Vision
      • Useful links
      • Wales and Western Safety Messages
  1. Home
  2. Safety

Safety

This section shares details on the work that is being carried out by various leadership groups to improve safety standards across the industry.

This section focuses on the work that is carried out on multiple programmes across the network to improve safety standards.

In this section

  • Any Line Open
  • Asbestos Awareness
  • Ballast Dust Working Group
  • Close Call
  • Code of Business Ethics
  • Delivery Point Management
  • Drive Safe
  • Driving Safety
  • East Midlands Interim Arrangements
  • Electrical Safety
  • Fatigue
  • Home Safe Plan
  • Industry Groups
  • Infrastructure Safety Leadership Group (ISLG)
  • Level Crossings
  • Management of Occupational Road Risk (MORR)
  • Managing the Risk of Runaways
  • Manual Handling
  • Network Rail Telecom
  • On Track Plant Safety
  • Our Health and Safety Vision
  • Planning and Delivering Safe Work
  • Preparation to Go Live
  • Prevention through Engineering and Design
  • Principal Contractor Licensing (PCL)
  • Public and passenger safety campaigns
  • Railway Security
  • Safety Hour
  • Safety Vision and Lifesaving Rules
  • School programmes
  • Sentinel
  • Signal and Level Crossing Engineering
  • Site Lighting
  • Winter Safety Campaign
  • Worksafe

Back to

  • Home

Latest

Latest Updates

  • OTP Do Not Use
  • Infrastructure Loading Patterns
  • Cookie Policy

Popular Pages

  • Jargon Buster
  • Advanced Search
  • Safety Bulletins

Latest Safety Bulletin

  • Shared Learning NRL26-03: Track measurement conducted without adequate competence and conductor rail isolation (PDF)
  • View all Safety Bulletins
© 2026 Network Rail
  • Privacy Policy
  • Cookie Policy
  • Terms of Website Use
  • Accessibility Statement
  • Modern Slavery Statement
  • Site Map