NR/L3/ELP/SAI25 Forms

NR/L3/ELP/SAI25 working on about overhead line equipment (SAI) has been expanded to cover the Routes in Scotland’s Railway and Southern in addition to North West & Central and Eastern Regions. The current phase introduces an enhanced electrical risk assessment and clarification on the management of distribution interfaces.

Where introduced, it replaces NR/L3/ELP/29987 – known as the ‘Green Book’.

There are some new and amended forms which are to be used to implement the requirements of SAI25. Publication and updates of these forms will be managed outside the Network Rail Standards and Controls website on this page of Safety Central. As a consequence, they no longer have an NR/L3 prefix. Instead they start with ELP/SAI25/.

This site contains the approved forms for use and is updated as required. For the standard and modules, please visit the Standard and Controls website.

Use this site for the current approved forms associated with SAI25.

Latest Update

Where a form has been updated it shall be used from the publication date.

SAI Forms Update 13 March 2026

Issue 2B Updates of ESSOW Category L & Category E tasks (narrated video)

Forms

Form reference numberIssueDescription of formStatus
ELP/SAI25/AE1ABlocking of Lines for Electric Traction Purposes
ELP/SAI25/AS1ABlocking of Lines for Electric Traction Purposes
ELP/SAI25/AT1ABlocking of Lines for Electric Traction Purposes
ELP/SAI25/B1BForm B: Authority to Test and Apply Portable Earths and Reminder of Live Exposed Equipment to Overhead Line Equipment Including Return Conductors and Autotransformer Feeders
ELP/SAI25/CT1ADeclaration of Isolation at Pelaw TPH Coast-Through Section Insulators Forming Boundary Between Electrical Control Areas
ELP/SAI25/EIDF1BEarthed Isolation Details Form
ELP/SAI25/ERAF2DElectrical Risk Assessment Form
ELP/SAI25/IPF1AIsolation Planning Form
ELP/SAI25/LWF1ALive Working Form
ELP/SAI25/N1ADeclaration of Switched-off OLE at Neutral Section Forming Boundary between Electrical Controls
ELP/SAI25/NC1ANetwork Rail / Other Third Party Electrification Systems Declaration of Switched-Off OLE at Neutral Section Forming Boundary at Interface Between Network Rail and Other Third Party Electrification Systems
ELP/SAI25/OLP2AOverhead Line Permit
ELP/SAI25/ORF1COutage Request Form
ELP/SAI25/SDF1AElectrical Control Room Switching Details
ELP/SAI25/STED1ASwitching, Testing, Earthing Details Form
ELP/SAI25/SVF2ACategory L – Site Visit Form
ELP/SAI25/TC1ADeclaration of Switched-off OLE at Section Insulator Forming Boundary between Network Rail & Supertram
ELP/SAI25/X/GBSIP/B1AAuthority to Test and Apply Portable Earthsand Reminder of Live Exposed Equipment to Overhead Line Equipment Including Return Conductors and Authotransformer Feeders in GBSIP areas
ELP/SAI25/X/GBSIP/STED1ASwitching, Testing, Earthing Details in GBSip areas
ELP/SAI25/Cat E2BApproved Live Working TasksUPDATED
ELP/SAI25/Cat L2BElectrical Safe System of Work (ESSoW) – Category L: List of approved Low Electrical Risk work activitiesUPDATED
ELP/SAI25

Contact

These documents are controlled by the Technical Authority Chief M&E Engineer’s team.

In the event of any queries please contact either Matt.Skinner@networkrail.co.uk or Ruth.Thomas@networkrail.co.uk