NR/L3/ELP/SAI25 Forms

NR/L3/ELP/SAI25 Working on or about Overhead Line Equipment (SAI), is being deployed across Eastern and North West and Central Regions. The current phase introduces an enhanced electrical risk assessment and clarification on the management of distribution interfaces.

Where introduced, it replaces NR/L3/ELP/29987 – known as the ‘Green Book’.

There are some new and amended forms which are to be used to implement the requirements of SAI25. During initial deployment of SAI25 in Eastern Region and North West & Central Region, these forms might be subject to change on a more frequent basis than the standard publication cycle. Publication and updates of these forms will be managed outside the Network Rail Standards and Controls website on this page of Safety Central. As a consequence, they no longer have an NR/L3 prefix. Instead they start with ELP/SAI25/.

This site contains the approved forms for use and is updated on a periodic basis even if there are no changes. For the standard and modules, please visit the Standard and Controls website.

Use this site for the current approved forms associated with SAI25.

Latest Update

Where a form has been updated it shall be used from the publication date.

 

SAI25 Forms Update 11th November 2024

Download SAI25 Forms Update 11th November 2024

Forms

 

Form reference number Issue Description of form Status Link

ELP/SAI25/AE

1A Blocking of Lines for Electric Traction Purposes UPDATED Download Blocking of Lines for Electric Traction Purposes

ELP/SAI25/AS

1A Blocking of Lines for Electric Traction Purposes UPDATED Download Blocking of Lines for Electric Traction Purposes

ELP/SAI25/AT

1A Blocking of Lines for Electric Traction Purposes UPDATED Download Blocking of Lines for Electric Traction Purposes

ELP/SAI25/B

1B Form B: Authority to Test and Apply Portable Earths and Reminder of Live Exposed Equipment to Overhead Line Equipment Including Return Conductors and Autotransformer Feeders UPDATED Download Form B: Authority to Test and Apply Portable Earths and Reminder of Live Exposed Equipment to Overhead Line Equipment Including Return Conductors and Autotransformer Feeders

ELP/SAI25/CT

1A Declaration of Isolation at Pelaw TPH Coast-Through Section Insulators Forming Boundary Between Electrical Control Areas UPDATED Download Declaration of Isolation at Pelaw TPH Coast-Through Section Insulators Forming Boundary Between Electrical Control Areas

ELP/SAI25/EIDF

1B Earthed Isolation Details Form UPDATED Download Earthed Isolation Details Form

ELP/SAI25/ERAF

2B Electrical Risk Assessment Form UPDATED Download Electrical Risk Assessment Form

ELP/SAI25/IPF

1A Isolation Planning Form UPDATED Download Isolation Planning Form

ELP/SAI25/LWF

1A Live Working Form UPDATED Download Live Working Form

ELP/SAI25/N

1A Declaration of Switched-off OLE at Neutral Section Forming Boundary between Electrical Controls UPDATED Download Declaration of Switched-off OLE at Neutral Section Forming Boundary between Electrical Controls

ELP/SAI25/NC

1A Network Rail / Other Third Party Electrification Systems Declaration of Switched-Off OLE at Neutral Section Forming Boundary at Interface Between Network Rail and Other Third Party Electrification Systems UPDATED Download Network Rail / Other Third Party Electrification Systems Declaration of Switched-Off OLE at Neutral Section Forming Boundary at Interface Between Network Rail and Other Third Party Electrification Systems

ELP/SAI25/OLP

2A Overhead Line Permit UPDATED Download Overhead Line Permit

ELP/SAI25/ORF

1A Outage Request Form UPDATED Download Outage Request Form

ELP/SAI25/SDF

1A Electrical Control Room Switching Details UPDATED Download Electrical Control Room Switching Details

ELP/SAI25/STED

1A Switching, Testing, Earthing Details Form UPDATED Download Switching, Testing, Earthing Details Form

ELP/SAI25/SVF

2A Category L – Site Visit Form UPDATED Download Category L – Site Visit Form

ELP/SAI25/TC

1A Declaration of Switched-off OLE at Section Insulator Forming Boundary between Network Rail & Supertram UPDATED Download Declaration of Switched-off OLE at Section Insulator Forming Boundary between Network Rail & Supertram

ELP/SAI25/X/GBSIP/B

1A Authority to Test and Apply Portable Earthsand Reminder of Live Exposed Equipment to Overhead Line Equipment Including Return Conductors and Authotransformer Feeders in GBSIP areas UPDATED Download Authority to Test and Apply Portable Earthsand Reminder of Live Exposed Equipment to Overhead Line Equipment Including Return Conductors and Authotransformer Feeders in GBSIP areas

ELP/SAI25/X/GBSIP/STED

1A Switching, Testing, Earthing Details in GBSip areas UPDATED Download Switching, Testing, Earthing Details in GBSip areas

ELP/SAI25/Cat E

2A Approved Live Working Tasks UPDATED Download Approved Live Working Tasks

ELP/SAI25/Cat L

2A Electrical Safe System of Work (ESSoW) – Category L: List of approved Low Electrical Risk work activities UPDATED Download Electrical Safe System of Work (ESSoW) – Category L: List of approved Low Electrical Risk work activities

Contact

These documents are controlled by the Technical Authority Chief M&E Engineer’s team.

In the event of any queries please contact either Matt.Skinner@networkrail.co.uk or Ruth.Thomas@networkrail.co.uk



← Back