NR/L3/ELP/SAI25 Forms

The content of this page is under development.

NR/L3/ELP/SAI25 Working on or about Overhead Line Equipment (SAI), is being deployed across Network Rail. The current phase introduces and enhanced electrical risk assessment and clarification on the management of distribution interfaces.

Where introduced, it replaces NR/L3/ELP/29987 – known as the ‘Green Book’.

There are some new and amended forms which are to be used to implement the requirements of SAI25. During initial deployment of SAI25, these forms might be subject to change on a more frequent basis than the standard publication cycle. Publication and updates of these forms will be managed outside the Network Rail Standards and Controls website on this page of Safety Central.

This site contains the approved forms for use and is updated on a periodic basis even if there are no changes. For the standard and modules, please visit the Standard and Controls website.

Use this site for the current approved forms associated with SAI25.

Latest Update

Where a form has been updated it shall be used from the publication date.

SAI25 Forms Update September 2024

Update to follow

Forms

Form reference number Issue Description of form Status Link

NR/L3/ELP/SAI25/AE

1 Blocking of Lines for Electric Traction Purposes Download Blocking of Lines for Electric Traction Purposes

NR/L3/ELP/SAI25/AS

1 Blocking of Lines for Electric Traction Purposes Download Blocking of Lines for Electric Traction Purposes

NR/L3/ELP/SAI25/AT

1 Blocking of Lines for Electric Traction Purposes Download Blocking of Lines for Electric Traction Purposes

NR/L3/ELP/SAI25/B

1A Form B: Authority to Test and Apply Portable Earths and Reminder of Live Exposed Equipment to Overhead Line Equipment Including Return Conductors and Autotransformer Feeders UPDATED Download Form B: Authority to Test and Apply Portable Earths and Reminder of Live Exposed Equipment to Overhead Line Equipment Including Return Conductors and Autotransformer Feeders

NR/L3/ELP/SAI25/CT

1 Declaration of Isolation at Pelaw TPH Coast-Through Section Insulators Forming Boundary Between Electrical Control Areas Download Declaration of Isolation at Pelaw TPH Coast-Through Section Insulators Forming Boundary Between Electrical Control Areas

NR/L3/ELP/SAI25/EIDF

1A Earthed Isolation Details Form UPDATED Download Earthed Isolation Details Form

NR/L3/ELP/SAI25/ERAF

2A Electrical Risk Assessment Form UPDATED Download Electrical Risk Assessment Form

NR/L3/ELP/SAI25/IPF

1 Isolation Planning Form Download Isolation Planning Form

NR/L3/ELP/SAI25/LWF

2 Live Working Form Download Live Working Form

NR/L3/ELP/SAI25/N

1 Declaration of Switched-off OLE at Neutral Section Forming Boundary between Electrical Controls Download Declaration of Switched-off OLE at Neutral Section Forming Boundary between Electrical Controls

NR/L3/ELP/SAI25/NC

1 Network Rail / Other Third Party Electrification Systems Declaration of Switched-Off OLE at Neutral Section Forming Boundary at Interface Between Network Rail and Other Third Party Electrification Systems Download Network Rail / Other Third Party Electrification Systems Declaration of Switched-Off OLE at Neutral Section Forming Boundary at Interface Between Network Rail and Other Third Party Electrification Systems

NR/L3/ELP/SAI25/OLP

2 Overhead Line Permit Download

NR/L3/ELP/SAI25/ORF

1 Outage Request Form Download Outage Request Form

NR/L3/ELP/SAI25/SDF

1 Electrical Control Room Switching Details Download Electrical Control Room Switching Details

NR/L3/ELP/SAI25/STED

1 Switching, Testing, Earthing Details Form Download Switching, Testing, Earthing Details Form

NR/L3/ELP/SAI25/SVF

2 Category L – Site Visit Form Download Category L – Site Visit Form

NR/L3/ELP/SAI25/TC

1 Declaration of Switched-off OLE at Section Insulator Forming Boundary between Network Rail & Supertram Download Declaration of Switched-off OLE at Section Insulator Forming Boundary between Network Rail & Supertram

NR/L3/ELP/SAI25/X/GBSIP/B

1 Authority to Test and Apply Portable Earthsand Reminder of Live Exposed Equipment to Overhead Line Equipment Including Return Conductors and Authotransformer Feeders in GBSIP areas Download Authority to Test and Apply Portable Earthsand Reminder of Live Exposed Equipment to Overhead Line Equipment Including Return Conductors and Authotransformer Feeders in GBSIP areas

NR/L3/ELP/SAI25/X/GBSIP/STED

1 Switching, Testing, Earthing Details in GBSip areas Download Switching, Testing, Earthing Details in GBSip areas

NR/L3/ELP/SAI25/Cat E

2 Approved Live Working Tasks Download

NR/L3/ELP/SAI25/Cat L

2 Electrical Safe System of Work (ESSoW) – Category L: List of approved Low Electrical Risk work activities Download Electrical Safe System of Work (ESSoW) – Category L: List of approved Low Electrical Risk work activities

Contact

These documents are controlled by the Technical Authority Chief M&E Engineer’s team.

In the event of any queries please contact either Matt.Skinner@networkrail.co.uk or Ruth.Thomas@networkrail.co.uk

Previous Updates

NR/L3/ELP/SAI25/B Issue 1
NR/L3/ELP/SAI25/EIDF Issue 1
NR/L3/ELP/SAI25/ERAF Issue 2