Tag Archives: Design

Preventing Points Run Through Letter 14.March.17.

Preventing Points Run Through Letter 14.March.17. Network Rail has taken the decision to mandate the implementation of additional controls for the movement of OTMs and OTPs within worksites. The additional control shall include the deployment of Til’ Dawn Lamps (TDL) where there are movements planned over switches and crossings (S&C). The process is mandated for […]

Media / document (pdf)

View pdf →