ALO

Any Line Open.

This is to clarify the requirement that any open line that has the potential to be fouled by the work being carried out on the infrastructure by construction plant or machinery must be assessed and controls put in place to ensure that the works will not affect the safe passage of trains. Where the word Adjacent was previously used it was mistakenly believed that only the line immediately adjacent was to be considered