On Site Solution

RSSB-Safety Critical Communications-Module-6-Skills

Important notice:

No one is permitted to use the T1078 Safety Critical Communications training materials unless they are an RSSB member, or when undertaking training/briefing as instructed, on behalf of, or contracted by a member. The materials cannot be used for any other purpose including sharing or commercial use. Copying and rebranding is not allowed as the materials are subject to RSSB copyright. © Rail Safety and Standards Board Limited, 2016. All rights reserved.

Any clarifications or additional queries can be directed to enquirydesk@rssb.co.uk. This publication can also be accessed by authorised audiences, via the SPARK website: www.sparkrail.org.

Media / document (pptx)

View pptx →


Preventing Points Run Through Letter 14.March.17.

Preventing Points Run Through Letter 14.March.17. Network Rail has taken the decision to mandate the implementation of additional controls for the movement of OTMs and OTPs within worksites. The additional control shall include the deployment of Til’ Dawn Lamps (TDL) where there are movements planned over switches and crossings (S&C). The process is mandated for […]

Media / document (pdf)

View pdf →


Catastrophic MEWP Boom Failure 03 03 2017_Manitou 160 ATJ based MEWPs

Catastrophic MEWP Boom Failure 03 03 2017_Manitou 160 ATJ based MEWPs All known MEWPs based on the Manitou models (160 ATJ PLUS & 160 ATJ PLUS RC) have been placed on the Do Not Use list until NDT inspection has been completed and machines confirmed to be fit for purpose. Those specifically identified are: • […]

Media / document (pdf)

View pdf →